Growfully grades in Sherwood from the Mayflower office. The Sherwood visit comes before any written price. Scope for this work sits on the Mayflower grading scope.
The Sherwood visit is when the ground gets read. Drawings get read on that same walk. Included grading is listed in the bid. The bid also names the machines.
Who asks for Sherwood grading
Builders and owners bring the Sherwood drawings. Grading is priced after the visit. The number covers the grade those drawings show.
Grading on a Sherwood job
The work is the grade the drawings call for. The bid names extra cuts the visit finds. Soil stays or leaves only when the bid says so.
Access for the grading crew
Access for Sherwood is judged on that visit. The bid names how machines reach the grade. The same bid names the trades that follow.
Permits for the Sherwood grade
The tract jurisdiction is what sets the permits. Permit handling is named in this bid. Phone 811 before the machines arrive. Runoff from grading is covered on the EPA notes on runoff after grading.